HSS Engineering

Bridge Projects

?Penang Bridge

Penang Bridge Widening

Preliminary engineering?Study and Detailed Design

?Malaysia-Singapore-2nd-Crossing-1-

Malaysia – Singapore Second Crossing

Independent Checking

?Bridge-Crossing-Sungai-Pulai-and-Link-Road-2

Proposed Bridge Crossing Sungai Pulai and Link Road from Tanjung Pelepas, Mukim Pulai Daerah, Johor Darul Takzim

Structural Design,?Site Supervision &?Project Management

?Proposed-Privatisation-of-North-Port-to-West-Port-Bridge-1

Proposed Privatisation of North Port to West Port Bridge Privitisation, Pulau Lumut, Port Klang

Preliminary Engineering Study

?Projek-Jambatan-Sungai-Dinding-1

Projek Jambatan Sungai Dinding, Lumut Perak

independent checking

?Bridge-at-South-Klang-Valley-Expressway-SKVE-1

Bridge at South Klang Valley Expressway (SKVE)

Project Management Consultancy Services

?Padang-Lalang-to-Tanjung-Lumpur-1

Padang Lalang to Tanjung Lumpur, Kuantan

Structural Design

?Connaught-Bridge-Across-Klang-River-1

Connaught Bridge Across Klang River

Construction supervision

?KTM-Double-Tracking-1

KTM Double Tracking (Package A, B and C)

Structural Design

?Bridges-Image18

Proposed General Cargo Terminal and Access Bridges at Westports

Civil and Structural design

?Pasir-Mas-Bridge-1

Pasir Mas Bridge

Structural Design

?Ampang-Pecah-to-Bukit-Rasah-Road-Bridge-1

Ampang Pecah to Bukit Rasah Road Bridge

Structural Design and Analysis

?Second-Penang-Crossing–Feasibility-Studies-1

Second Penang Crossing

Feasibility study

?Mutiara-Crossing-Feasibility-Studies

Mutiara Crossing

Feasibility study

?Remedial-Work-of-Substructures-and-River-Bank-Protection-1

Remedial Work of Substructures and River Bank Protection on Bridges 1104 and 1068

Detail Design and?Site supervision

?Fire-at-Penang-Bridge-1

Structural Engineering Assessment on Testing and Rectification Works to Bridge Structures Damaged by Fire at Penang Bridge

Detailed Structural Assessment & Site Supervision

?North-South-Expressway-Central-Link-3

North South Expressway Central Link Proposed Remedial Works to rehabilitate the sub-structure of Sg. Langat Bridge

Construction Supervision

?Putrajaya-Bridge-1

Assessment of Viaduct to Putrajaya Bridge KM P5.7 both North –South Bound Expressway Central Link (NSECL)

Detailed Investigation with Details Supervision

在线精品国产在线视频